Tender

Digital copies of Bid Documents will be available on or after March 13, 2026 from the Buildworks Canada website: www.buildworkscanada.com.

Tenders will be received by the undersigned until: 2:00 P.M., April 2, 2026

At the Administration Office of:

                      Saddle Hills County                                           Phone 780-864-3760

                             Tender Deposit (reception) Counter

                             RR#1 (Jct of Hwy 49 and Hwy 725)

                             Spirit River, Alberta  T0H 3G0

For the following work:

Tender No. CA0050951.5625

Bridge Culvert Installation and Other Work

Bridge File No. 76019

Tributary to Pouce Coupe River, Township Road 763, SW 20-76-13-W6M

2.20 mm Diameter CSP Culvert by 28.0 m Invert Length

Bridge File No. 79103

Tributary to Pouce Coupe River, Range Road 135, NW 17-76-13-W6M

2.20 mm Diameter CSP Culvert by 31.0 m Invert Length

Note: Contractor to supply all materials.

            Contract Completion Date: October 31, 2026

Tenders must be accompanied by a certified cheque or bid bond in the amount of ten percent (10%) of the total sum tendered. Lowest or any tender will not necessarily be accepted. If further information is required, please contact Mr. Shihang (Kevin) Zhao, WSP Canada Inc., at 587-343-5729.